Whaley Bridge Dam Stabilisation Works

September 3, 2019

 

 

The Team at P & D Environmental Ltd have been privileged to have been involved in the work to stabilise Whaley Bridge Dam working alongside specialist team from the emergency services, The RAF and Kier, we have been involved in the fabrication and installation of bespoke floating Pump cages to house the 12-inch pumps that have been installed to drain the water from Toddbrook reservoir.


Following a Joint site visit on Sunday morning with our sister company The Pontoon and Dock Company and Main contractor Kier, We designed, fabricated and had the first unit installed by Tuesday evening with the other two units being installed shortly afterwards.


These floating units will allow the pumps to be positioned within the reservoir in such a way that the water level can be reduced without the need for the pumps to be relocated as the level decreases with the ability to access the pumps should it be required.


The units will remain in place to control water levels inside the reservoir until a long-term solution can be implemented keeping the residents of Whaley Bridge safe.

Please reload

Featured Posts

Stoneleigh Abbey Estate

September 17, 2015

1/1
Please reload

Recent Posts

September 17, 2015

Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
Members of the British Marine Federation
CHAS Accredited Contractors
ISO 9001 Registered Contractors
ISO 14001 Registered Contractors

ADDRESS 

Repton House 

Bretby Business Park

Bretby

Burton Upon Trent

Staffordshire

DE15 0YZ

  • White LinkedIn Icon
  • w-facebook
  • Twitter Clean
  • w-googleplus

© 2020 P&D Environmental